This site uses cookies. By clicking any link on this page you are giving your consent for us to set cookies. Details
The works for Bucharest Metro Line M5 are expected to be completed soon. UTI Grup has provided the installations that enable the proper operation of the metro stations and of the underground infrastructure.

The works for Bucharest Metro Line M5 are expected to be completed soon. UTI Grup has provided the installations that enable the proper operation of the metro stations and of the underground infrastructure.

22.06.2020

The works for the Bucharest Metro Line M5, Raul Doamnei–Eroilor section, are nearing completion. The first tests with trains without passengers took place on the weekend of June 20-21, 2020. Line M5 is one of the most important urban transportation infrastructure projects in Romania, not only due to the complexity of the works performed, but…

Read

UTI Grup has taken serious measures to prevent the COVID-19 pandemic

UTI Grup has taken serious measures to prevent the COVID-19 pandemic

24.03.2020

The COVID-19 pandemic brought about individual and organizational challenges that we have never encountered before. In order to protect their employees, to continue their operations and to meet the clients’ needs in this special context, the member companies of UTI Grup have implemented an array of measures, observing the authorities’ recommendations to prevent the spread…

Read

Altimate implemented a traffic lights system in Filiași that facilitates the city transit and reduces the number of accidents.

Altimate implemented a traffic lights system in Filiași that facilitates the city transit and reduces the number of accidents.

05.03.2020

Altimate, member of the UTI group of companies, recently completed the implementation of a traffic lights system on DN 6, covering Filiași town. The continuous increase of the vehicle flow passing through this municipality, the frequent congestions and the registered accidents determined the National Company of Road Infrastructure Management, through Craiova Regional Direction of Roads…

Read

UTI Facility Management will provide maintenance services for 26 Penny Market stores in Romania

UTI Facility Management will provide maintenance services for 26 Penny Market stores in Romania

13.02.2020

UTI Facility Management will provide preventive and corrective maintenance services for thermal, electrical, sanitary systems, low currents, fire pumping stations, ventilation, air conditioning and automation systems for  26 Penny Market stores, opened in our country by the retailer Rewe Romania. Our teams will intervene 24/24, 7/7 in these locations, which were built in different regions…

Read

Right of reply regarding the false information presented by national.ro

Right of reply regarding the false information presented by national.ro

31.01.2020

As a result of the publication on the national.ro site, on January 30, 2020 of the article entitled “Shocking DOCUMENTS! The “DNA snitch” blows up the secret services! “, in which you make false and defamatory statements about UTI Grup and UTI Facility Management, for which you did not ask for our point of view,…

Read

NATO uses technology provided by UTI Grup within the Alliance Ground Surveillance (AGS) System

28.01.2020

UTI Grup has provided core modules for two important software components of NATO Alliance Ground Surveillance System: the software command and control application for the main command and control center (MOS – Mission Operation Support) and the software application for the Transportable General Ground Stations – TGGS. The software applications provide voice and message communications,…

Read

UTI celebrates 29 years of evolution and performance

UTI celebrates 29 years of evolution and performance

04.10.2019

Since October 5, 1990 UTI has continuously evolved, developing complex technological solutions and products and adapting its organization structure to the business needs. On its 29th anniversary, UTI finds itself in a consolidation and adaptation stage. After a 28-year period when UTI has become a strong unitary brand and a diversified technological business portfolio, at…

Read

UTI Grup and UTI Facility Management will participate in the construction of the passenger terminal of Brașov-Ghimbav Airport

UTI Grup and UTI Facility Management will participate in the construction of the passenger terminal of Brașov-Ghimbav Airport

23.08.2019

The joint-venture of Bog’Art SRL – UTI Grup SA – UTI Facility Management SA was designated the winner of the public bid organised by the Brasov County Council for the construction of the passenger terminal of the Brasov-Ghimbav International Airport and signed the contract for the works execution. The terminal will be built on three…

Read