ARAD, Romania – Tramway Line and Street Rehabilitation
Country |
City |
Inhabitants |
Area |
Romania |
Arad |
172,827 |
116 km2 |
The project has been divided into two stages, the first one included 24 intersections, while the second phase was made up of 11 intersections.
Components
- Road signaling intersection design
- Traffic lights, traffic controllers, and detectors
- System commissioning and testing
Advantages
- Direct communication with the maintenance teams through the traffic controller software
- Permanently monitored intersections
- Close to 100% traffic light availability
- Local adaptive functionality
The solution is based on LED-technology traffic lights with lower energy consumption that subsequently lead to great savings to the budget of the municipality.